Bathroom Remodeling

Transform your bathroom into a functional, modern space with our end-to-end renovation service.

Newly renovated bathroom with modern wall tiles and frameless glass shower screen

Bathroom Renovations Done Right

A bathroom renovation involves plumbing, electrical, waterproofing, tiling, and carpentry — all in a tight space where every millimetre counts. Coordinating multiple trades is where projects go wrong, which is exactly why homeowners across KL trust Bold Move to manage the entire process.

We assign a single project lead to every renovation. They oversee the timeline, quality, and budget from the first consultation to the final walkthrough, so you always know who to call with questions.

  • Single point of contact from start to finish
  • Licensed plumbers and electricians on the same team
  • 12-month warranty on materials and workmanship
  • Detailed 3D layout provided before demolition begins
  • Dust barriers and daily clean-up to protect your home
Start Your Renovation

Our Renovation Process

A clear, five-stage workflow keeps your project on track and eliminates surprises.

1. Consultation & Design

We visit your home, take precise measurements, discuss your preferences for fixtures and finishes, and prepare a detailed quotation with a 3D layout so you can visualise the final result before any work begins.

2. Demolition & Preparation

Old tiles, fixtures, and fittings are carefully removed. We inspect the substrate for structural issues, patch any damaged areas, and prepare surfaces for the new waterproofing membrane.

3. Plumbing & Electrical

Water supply lines, waste pipes, and drainage are rerouted or replaced according to the new layout. Electrical points for lighting, exhaust fans, and water heaters are installed or repositioned by our ST-licensed electricians.

4. Waterproofing & Tiling

A cementitious waterproof membrane is applied to all wet areas and flood-tested for 48 hours before tiling begins. Wall and floor tiles are laid with precision, using spacers and laser levels for a uniform finish.

5. Fixture Installation & Finishing

Sanitary ware, shower screens, vanity cabinets, mirrors, and accessories are installed. We perform a thorough quality check, test every connection, and walk you through the completed bathroom before handover.

What Our Renovation Clients Say

★★★★★

Bold Move renovated both bathrooms in our semi-D in Kepong. The project lead kept us updated daily and the team even suggested a layout change that saved us money on pipe rerouting. The finished bathrooms look like they belong in a showroom.

Mei Ling T.
Kepong
★★★★★

We were nervous about renovating while living in the house, but the crew set up dust barriers and cleaned up every evening. They finished the master bathroom in nine days as promised, and the waterproofing passed the flood test with no issues. Very professional.

Rajan S.
Sri Hartamas

Bathroom Remodeling FAQs

A standard single-bathroom renovation takes 10 to 14 working days from demolition to handover. The timeline depends on the scope of plumbing changes, tile complexity, and whether custom carpentry is involved. We provide a detailed schedule before work starts.
Yes. We install protective sheeting and dust barriers to contain the work area. Water and electricity to the rest of the house remain functional except during brief switchover periods, which we schedule in advance so you can plan around them.
We offer both options. You are welcome to purchase your own materials, and we will advise on specifications to ensure compatibility. Alternatively, we can source everything through our trade accounts, often at better prices than retail, and include it in a single quotation.

Ready to Upgrade Your Bathroom?

Book a free consultation and receive a detailed renovation plan with a transparent, itemised quotation.